Works on the Vistula Spit diversion are progressing
Traffic tests of the second rotary bridge, assembly of hydrotechnical equipment at the sluice gate and works on the construction of an artificial island on…
Trials of the second swing bridge on the canal across the Vistula Spit
Trials of the second swing bridge and installation of hydro-technical equipment in the lock are currently being carried out at the construction site of the…
Port in Elbląg getting closer to the Baltic Sea
The construction of a waterway linking the Gdansk Bay with the Vistula Lagoon has continued. Thanks to this investment, the port of Elbląg will gain…
Tourists eager to see construction of waterway across the Vistula Spit
The shipping canal being built through the Vistula Spit has already become a major attraction. Many tourists watched the construction of the new waterway during…
President’s visit to Remontowa Holding Group shipyard and Vistula Spit
President Andrzej Duda will visit the Remontowa Holding Group shipyard and the Vistula Spit diversion site on Thursday. The purpose of the visit is to…
Dig through the Vistula Spit: “the investment runs smoothly”
Work is in progress on the project “Construction of a waterway connecting the Vistula Lagoon with the Gulf of Gdansk”. On 12 May, the construction…