Archive

Tag: rig

PGNiG gains consent to use Odfjell rig on Norwegian shelf for Shrek wildcat drilling

As announced on August 16, 2019, the Norwegian Petroleum Directorate has granted PGNiG Upstream Norway AS a drilling permit for well 6507/5-9 S in production licence…

Petrobaltic offshore rig docked on board a heavy lift vessel

On 7 January, 2017 at Remontowa Shiprepair Yard in Gdańsk, a special docking operation was conducted. The shipyard with the assistance of six tugs, docked…

EPG delivered accommodation module for Maersk Guardian rig

Energomontaż-Północ Gdynia accomplished construction of the accommodation block for Maersk Guardian drilling rig. After loading process, which lasted two days, finally the module onboard a…

Skip to content