Topside with living quarters partly fabricated in MSR Gryfia installed on Ivar Aasen
The Ivar Aasen topside is in place on the field at UtsiraHight. Approximately 15,000 tons was lifted onto the jacket with first oil expected in…
The Ivar Aasen topside is in place on the field at UtsiraHight. Approximately 15,000 tons was lifted onto the jacket with first oil expected in…